Print PageEmail PageRSS
Home • Intranet • Sitemap • Contact Us
City of Berkeley, MO A Planned Progressive Community
Site Search
Go To Site Search
2009 Comprehensive Plan
2009 Comprehensive Plan is now on-line
The 2009 Comprehensive Plan has been adopted by the Planning and Zoning Commission and an electronic version may be obtained by following the link below.

2009 Comprehensive Plan - Follow this link to view an electronic version of the Plan (This file may take a few minutes to download).


Comprehensive Plan Updates
In addition to the Comprehensive Plan, the Community Development Department has begun to undertake more detailed level surveys and is currently studying the Airport Road Corridor and the Frost Avenue Corridor for consideration of potential future projects such as streetscape enhancements and other projects to enhance these vital corridors within the community.  The Department has developed several graphics that represent analysis of existing conditions and conceptual drawings that look to address the needs of both corridors.  Follow the links provided below to access these conceptual drawings.

Airport Road Existing Conditions
Airport Road Planning Considerations
Frost Avenue Existing Conditions
Frost Avenue Planning Considerations


For more information regarding the 2009 Comprehensive Plan or to become involved please contact the Department of Community Development.


6140 N. Hanley Road • Berkeley, MO 63134 • Ph: (314) 524-3313 • Fx: (314) 264-2070
Home • Boeing Website • Accessibility • Powered by CivicPlus • Copyright Notices